Confirm the eligible pathway
Some measures use a single-upgrade path while others involve an assessment or bundle. Use the current program portal for the exact solar and storage rules.
An advertised maximum is not the same as an approved project.
Ontario’s Home Renovation Savings program currently advertises up to $10,000 for eligible solar panels and battery storage. Home, equipment, contractor and timing requirements must be confirmed before purchase or installation.
Some measures use a single-upgrade path while others involve an assessment or bundle. Use the current program portal for the exact solar and storage rules.
A rebate does not replace Hydro Ottawa interconnection, ESA inspection or municipal permit requirements.
Keep program confirmation, contractor information, equipment details, invoices and approval dates in one project record.
Hydro Ottawa net metering can credit eligible renewable generation exported to the grid. Credits are non-cash, grid capacity and approvals matter, and any remaining credit expires 12 months after it was created.
No. “Up to” is a maximum; the approved amount depends on current eligibility and completed measures.
The program advertises solar panels and battery storage. Confirm current combination and equipment rules before contracting.
No. Net metering is a separate Hydro Ottawa utility arrangement with its own application and technical requirements.
Programs, rates and requirements can change. These are the primary sources used for this page.
Verified July 12, 2026