Use energy before exporting it
The closer production aligns with building loads, the more energy is used directly instead of relying on future credits.
Exported renewable energy can create a non-cash bill credit; it is not a cash payment for all production.
Under Hydro Ottawa net metering, solar production serves the building first. Eligible excess generation exported to the grid creates a non-cash credit under the applicable rate plan, subject to connection and program rules.
The closer production aligns with building loads, the more energy is used directly instead of relying on future credits.
Hydro Ottawa states that any remaining generation credit expires 12 months after it was created. System sizing should account for that rule.
Grid capacity, Hydro Ottawa assessment, ESA requirements and municipal permits must be completed before connection.
Hydro Ottawa net metering can credit eligible renewable generation exported to the grid. Credits are non-cash, grid capacity and approvals matter, and any remaining credit expires 12 months after it was created.
No. Hydro Ottawa describes them as non-cash credits that cannot be redeemed as payment for other services.
Hydro Ottawa says storage may be paired with an eligible renewable energy technology; storage by itself does not qualify.
Standard grid-tied solar shuts down for safety. Backup requires compatible islanding equipment, controls and usually a battery.
Programs, rates and requirements can change. These are the primary sources used for this page.